For immediate Service, Call (800) 341-4334

Visit us at PBIOS October 18 -20

PBIOS 2016 - STANDING TALL!

Palmer Johnson Power Systems is proud to be apart of Permian Basin International Oil Show 2106. To ensure that you make the most of your trip to PBIOS, we've put together a listing of helpful information about the show in one location.

Palmer Johnson Power Systems will be located in Building A booth 9 & 10. To schedule a meeting with Mark Young the Oil & Gas Market Manager to learn more about PJ email him at [email protected]. He can also be reached at 817-247-7718. We look forward to seeing you in Texas!

PBIOS schedule:

  • Tue, October 18th 8am - 6pm
  • Wed, October 19th 8am - 6pm
  • Thur, October 20th 9am - 3pm

Maps:

Places to Eat:

Weather:

Display units:

  • Cotta Pump Drive - PD440-1
  • Wichita Brake - 224wcbam
  • Eaton Brake - 136WCB3
  • Twin Disc Air Clutch - PO224
  • Twin Disc Pump Drive - AM320

Keep Reading

PJ News

Palmer Johnson Supplies Transfluid Hybrid System for Alaska's First Hybrid Fishing Vessel

A hybrid diesel-electric first for Alaska's fishing fleet: Palmer Johnson supplied the Transfluid components powering the F/V Mirage's repower in Sitka, built for cleaner, quieter operation.
Read More

PJ News

Palmer Johnson Supplies Transfluid Hybrid System for Alaska's First Hybrid Fishing Vessel

Read More

PJ News

Duramax Marine Products Now Available from Palmer Johnson

Duramax Marine Thumbnail Photo
Read More

PJ News

Three Companies, One Name: Introducing Palmer Johnson

PJ thumbnail photo
Read More